project details

  • We ensure the service quality
  • Precision, safety, accountability
  • Strict quality control
  • Reliable timelines, transparency
  • Durable, standard-driven results
📍 Sri Lanka
Captive Power Plants & Numerical Relay Protection

8MW Tokyo Captive Power Plant, Trincomalee

Testing & Commissioning Scope
  • Testing of Generator Neutral Side CT — 3 No’s
  • Testing of NGR CT & Sensitive Earth Fault (SEF) Function Check
  • Testing & Stability Test for 8MW Alternator
  • Testing of LASCPT & Secondary Voltage Relaying Measurements
  • AVR Panel Lamp Load Test
  • Dummy Synchronization Checks: CB-2 Tie Feeder, CB-3 Tie Feeder & CB-6 Grid Incomer Feeder
  • Commissioning of Generator Transformer
  • Configuration, Testing & Commissioning of 10MVA Power Transformer
  • Coordination & Commissioning of 11kV Switchgear Panel & 2MVA Transformer
  • Operational Observation & Validation across all commissioned systems
Numerical Relays & Metering
  • Configuration, T&C of 33kV ABB Numerical Relays — 5 No’s
  • Configuration, T&C of Spare ABB Numerical Relays — 3 No’s
  • Configuration, T&C of 11kV ABB Numerical Relays — 2 No’s
  • T&C of Electromechanical Relays at 415V PCC Panel — 4 No’s
  • Configuration, T&C of Siemens 7UM622 Numerical Protection Relay
  • Configuration, T&C of Multifunction Meters (4 No’s) & Trivector Meters (3 No’s)
  • Configuration, T&C of Synchronizing Relay Alstom (SKE)

4MW KMRI Captive Power Plant, Mirigama

Primary Equipment Testing
  • Testing & Commissioning of 4MW Alternator & Alternator Stability Test
  • Testing & Commissioning of LAPT — 3 No’s
  • Testing & Commissioning of HT Cables (Alternator to Transformer)
  • Testing & Commissioning of Sensitive Earth Fault (SEF) CT
  • Testing & Commissioning of 11/0.415kV Generator Transformer
  • Synchronizing Check completed via Back Charging
Relay & Metering Integration
  • Configuration, Testing & Commissioning of Siemens Protection Relays
  • Configuration, Testing & Commissioning of Sync Check Relay
  • Configuration, Testing & Commissioning of CDG11 Standby Earth Fault (EF) Relay — 1 No.
  • Configuration, Testing & Commissioning of VAJ Relays — 3 No’s
  • Configuration, T&C of Energy Meters, Trivector Meters, Ammeters, Power Factor & Frequency Meters
  • Final Observation & Operational Stability Sign-off

6MW Dendro Biomass Captive Power Plant, Mahiyangana

Power Generation & Grid Synchronization
  • Testing & Commissioning of Surge Arrestor, Surge Counter & Potential Devices
  • Testing & Commissioning of Generator Line Side CT & Neutral Side CT
  • Testing & Commissioning of 6MW Alternator & Full Alternator Stability Checks
  • Testing & Commissioning of Exciter & Excitation Transformer
  • System Back Charging & Dummy Synchronization Execution
  • Open Circuit (OC) and Short Circuit (SC) Generator Characterization Tests
  • Generator Circuit Breaker Synchronization with 33kV Utility Grid Breaker
  • Comprehensive system observation & operational stability sign-off
📍 Afghanistan
220/20kV High Voltage Transmission Substations

220/20kV Substation — Doshi

220kV Primary Equipment
  • Testing & Commissioning of 220kV Circuit Breakers — 5 Sets
  • Testing & Commissioning of 220kV Current Transformers — 7 Sets
  • Testing & Commissioning of 220kV CVT (3 Sets) & Potential Transformers (3 Sets)
  • Testing & Commissioning of 220kV Lightning Arrestors — 2 Sets
  • Testing & Commissioning of 220kV Disconnectors (5 Sets) & Earth Switches (5 Sets)
  • T&C of 16MVA 220/20kV Power Transformer — 1 No.
  • T&C of 100kVA 20/0.415kV Auxiliary Transformer — 1 No.
Protection, Automation & 20kV Switchgear
  • Testing & Commissioning of 220kV Control & Relay (C&R) Panels
  • Power Transformer Body Protection Wiring & Functional Checks
  • RTCC & OLTC Wiring & Functional Operation Verification
  • Testing & Commissioning of 20kV Switchgear Panels (PT, CT, CB, Disconnector, E/S, LA)
  • Transformer Stability & Busbar Stability Verification
  • SCADA, Telecommunication Interface & Trip Signal Testing

220/20kV Substation — Charikar

220kV Primary Equipment
  • Testing & Commissioning of 220kV Circuit Breakers — 4 Sets
  • Testing & Commissioning of 220kV Current Transformers — 5 Sets
  • Testing & Commissioning of 220kV CVT (3 Sets) & Potential Transformers (2 Sets)
  • Testing & Commissioning of 220kV Lightning Arrestors — 2 Sets
  • Testing & Commissioning of 220kV Disconnectors (4 Sets) & Earth Switches (4 Sets)
  • T&C of 16MVA 220/20kV Power Transformer — 1 No.
  • T&C of 100kVA 20/0.415kV Auxiliary Transformer — 1 No.
Protection, Automation & 20kV Switchgear
  • Testing & Commissioning of 220kV Control & Relay (C&R) Panels
  • Power Transformer Body Protection Wiring & Functional Checks
  • RTCC & OLTC Wiring & Functional Operation Verification
  • Testing & Commissioning of 20kV Switchgear Panels (PT, CT, CB, Disconnector, E/S, LA)
  • Transformer Stability & Busbar Stability Verification
  • SCADA, Telecommunication Interface & Trip Signal Testing
📍 Indonesia
Industrial Co-Generation Plant

PT. Tereos 1x9MW Co-Generation Power Plant, Cilegon

Generation & Switchgear Scope
  • Testing & Commissioning of HT Panel Switchgear — 6 Verticals
  • Generator Testing (1 Qty) & Generator Stability Test
  • T&C of Generator Transformer (1 Qty) & Auxiliary Transformers (2 Qty)
  • Dummy Synchronization Testing for TG Breaker & Utility Grid Breakers
  • Testing & Commissioning of LASCPT Cubicle (CT, PT, LA, Surge Capacitor)
  • Testing & Commissioning of Excitation T/G, NGT / NGR & Earthing Transformer
  • Testing & Commissioning of Existing Plant HT Integration
  • Battery Discharge Testing for 110V DC & 220V DC Banks
  • Inter-panel Wiring Checks for AVR, SYN & RMP Panels
  • RTCC Panel Wiring Through-Check & Energization/Charging
📍 Laos
Thermal Power Plant & Generator Overhauling

1.5MW Sulphur Treatment Plant (Lao Mee Sai)

Overhauling & Diagnostics Scope
  • Complete Dismantling, Overhauling & Reassembling of 1.5MW Merlin Generator
  • Complete Health Check for all Power Cables & Control Cabling Infrastructure
  • Relay Calibration: TGP, AVR, MCC and Outgoing Feeders
  • SCADA & PLC Module Logic Verification against System Schematics
  • Thermal Power Plant Interlock System Logic Validation
  • Battery Bank & Battery Charger Testing (Cell Voltage Profiling)
  • DC Startup Panel Inspection & Troubleshooting
  • Engineering Recommendations: Relay Setting Optimization & Meter Modernization